01/07/2009 20:27:04
 
OIL & GAS
Successfully loaded out Topside of Phuong Dong Oil Rig Platform

05/29/2008 16:02:17

After duration of six month fabrication, on 26 May 2008, at VSP yard, Petroleum Equipment Assembly & Metal Structure Co.,Ltd (PVC-MS) and the EPC Contractor Vietsovpetro successfully loaded out the topside of Phuong Dong Oil Field invested by Japan Vietnam Petroleum Company (JVPC). This is the first oil rig platform installed and to exploit petroleum at Phuong Dong Field, locates in block 15-2, held 45% of shares and operated by JVPC. Fabricating Phuong Dong topside was fully performed by Vietnamese personnel. This proved the specific advancement of oil and gas technical services of Vietnamese personnel. The project has been highly appreciated by the investor and the American Bureau of Shipping (ABS). D.T
Print
 
NEWS MORE
PetroVietnam fertilizer signs import deal with Qatar fertilizer (18/05/2008)
Vietsovpetro Joint Venture (VSP): rise up in oil and gas industry field (13/05/2008)
Work begins on Vietnam’s $6 billion oil refinery (11/05/2008)
Vietnam to start building $6 billion oil refinery (06/05/2008)
PetroVietnam proposal fuels Oman cooperation (18/04/2008)
Petroleum Industry to Enjoy More Open Policies (31/03/2008)
Protection in oil and gas projects (24/03/2008)
PetroVietnam imports gas to plug shortage (14/03/2008)
Nippon Oil Vietnam venture gains CO2 credits (04/03/2008)
PTSC: Load- out sucessfully BO- D Oil Rig Platform (25/02/2008)
Next

 

 
Search with Google
 
Back to top Add to Favorites Set to homepage
© BariaVungTau Newspaper Online